Fabriqué en Grande-Bretagne

Directement de notre usine

Livraison gratuite le lendemain

Pour toute commande supérieure à 750 £

Résultats du test produit

Tous les résultats des tests publiés

Conseils techniques d'experts

Appelez ou discutez avec notre équipe

Cliquez sur une icône pour explorer les fonctionnalités Appuyez sur une icône pour explorer les fonctionnalités

Flowable Single Pour

Add 25kg of powder to 5 litres of clean water and mix to a smooth, lump-free consistency. The material pours rather than packs: it self-levels into the repair and needs only light trowelling to close it off, at any depth from 5mm to 100mm in one application. Pot life is 5-10 minutes at 20°C, so mix only what you can pour immediately.

Rapid Strength Development

The fibre reinforced, polymer modified cement gains strength fast enough to return the floor to service the same shift. At 20°C the repair takes foot traffic in 30-60 minutes and forklift traffic in approximately 2 hours. Compressive strength passes 20N/mm² at one day and 45N/mm² at 28 days, tested to EN 13892-2.

Profil de performance

Fibre reinforced, polymer modified cement mortar. Mixed with water it pours as a slurry and self-levels into the repair. Strength builds fast — above 20N/mm² at one day, above 45N/mm² at 28 days, tested to EN 13892-2. Light foot traffic in 30 to 60 minutes, forklifts in around two hours.

Télécharger la fiche technique
Coverage 0.5m²per 25kg at 25mm thick
Depth 5-100mmin one application
Pot Life 5-10 minutesat 20°C
Forklift Ready 2 hrsat 20°C

Informations essentielles

Détails du produit

Description

EverFlor FlowFix Patch is a cement-based repair mortar, fibre reinforced and polymer modified, supplied as a dry powder in a plastic mixing bucket. It is a one-component product: add clean water, mix, and pour. No primer is needed and no resin components have to be weighed or blended.

The mixed material is a free-flowing slurry rather than a stiff mortar. Poured into a prepared hole it self-levels, so finishing is limited to a light trowel where placement needs assisting. It can be placed at any depth between 5mm and 100mm in a single application, which covers most of the damage found in industrial concrete: spalled bays, broken edges, worn doorways and potholes, inside and out.

Holes in a working floor are more than a cosmetic problem. They slow pedestrian and wheeled traffic, add to housekeeping, and present a trip and handling risk. FlowFix Patch closes them quickly. Strength development is rapid — above 20N/mm² at one day and above 45N/mm² at 28 days, tested to EN 13892-2 under EN 13813:2002. The repair takes light foot traffic in 30 to 60 minutes and forklift traffic in around two hours at 20°C. Once cured it resists oils and grease, and after approximately 24 hours it can be overcoated with a suitable floor coating.

Recommended areas of use

  • Damaged concrete floors in warehouses and factories
  • Loading bays and distribution centres
  • Workshops and industrial premises
  • Internal and external concrete surfaces
  • Holes and voids filled prior to resurfacing

Features

  • Pours and self-levels into the repair, so finishing is minimal
  • One powder, one water ratio, mixing bucket supplied with the 25kg kit
  • Fibre reinforced and polymer modified for a durable repair under wheeled traffic
  • Light foot traffic in 30-60 minutes and forklifts in approximately 2 hours at 20°C
  • Compressive strength above 45N/mm² at 28 days
  • Placed at any depth from 5mm to 100mm in one application
  • Resistant to oils and grease once cured
  • Serviceable from -20°C to 70°C, interior and exterior
  • No primer required, and the substrate may be damp

Good to know

Pot life is short — 5 to 10 minutes at 20°C. Mix beside the repair rather than at the water source, and mix only what you can pour straight away. Do not add extra water to buy working time: it extends curing and reduces performance.

The substrate may be damp but must not hold standing water. Cut the edges of the repair square to depth rather than feathering out where medium or heavy traffic is expected. The product is not suitable for repairs on sloping surfaces. Do not apply below 5°C, and protect fresh material from freezing until fully cured; at around 5°C allow up to 24 hours before putting the floor into service.

Application

SURFACE PREPARATION

The substrate must be structurally sound, clean and free from dust, oil, grease, paint, curing compounds and anything else that would impair adhesion. Remove all loose or friable material by suitable mechanical preparation. Wire brushing or sweeping is generally sufficient on sound concrete.

Cut the edges of the repair square where possible to give a secure bond, particularly in heavily trafficked areas. The substrate may be damp, but it must not contain standing water. No primer is required.

MIXING

Place approximately 5 litres of clean water in the supplied bucket or another suitable vessel. Add the 25kg of powder gradually while mixing continuously with a slow-speed electric drill and a suitable paddle. Mix until the material is smooth, lump-free and pourable.

Do not add excess water. It reduces performance and extends curing times. Mix beside the repair rather than at the water source, and mix only what you can place immediately. Pot life is 5 to 10 minutes at 20°C.

APPLICATION

Pour the mixed material straight into the prepared area. The mortar self-levels with minimal finishing; where necessary, trowel lightly to assist placement. Apply between 5mm and 100mm in a single application.

Thin feather edges are acceptable only in lightly trafficked areas. Do not feather edge repairs that will take medium or heavy traffic. The product is not suitable for repairs on sloping surfaces.

CURING AND CLEANING

At approximately 20°C, allow 30 to 60 minutes before light foot traffic and approximately 2 hours before heavy traffic including forklifts. Setting time is 24 hours. Lower temperatures increase curing times; at around 5°C, allow up to 24 hours before placing the floor into service.

Do not apply when substrate or ambient temperatures are below the 5°C minimum, and protect freshly applied material from freezing until fully cured. Wash tools in water immediately after use. Where the repair is to be painted, allow approximately 24 hours before applying a suitable floor coating.

Fichiers et fiches techniques

Le Centre de Connaissances

Tout ce que vous devez savoir

Parcourez notre collection d'articles détaillés et de guides pratiques conçus pour vous aider à tirer le meilleur parti de ce produit. Que vous ayez besoin d'aide pour la préparation des surfaces ou de conseils d'application, nous avons ce qu'il vous faut.

Afficher le Centre technique

A visual comparison of a mossy, weed-infested block paving driveway next to a freshly cleaned section in the UK.
  • par Sam Marriott

Restauration de pavés autobloquants : Élimination de la mousse, des mauvaises herbes et du lichen

Le pavage est le choix le plus populaire pour les allées au Royaume-Uni, mais il présente un défaut de conception majeur : Les joints. Ces milliers d'espaces entre les briques sont le terreau idéal pour les mauvaises herbes, la mousse...

Plus

An unbranded industrial floor scrubber being used to maintain the high-gloss shine on a polished concrete warehouse floor.
  • par Sam Marriott

Nettoyer en profondeur le béton poli sans ternir sa brillance

Le béton poli est souvent vendu comme l'option de revêtement de sol "sans entretien". C'est un mensonge. Oui, il est incroyablement durable. Il ne s'écaillera pas comme de la peinture. Mais si vous l'ignorez, ou pire – si vous le...

Plus

Two unbranded silver tins labeled Acid and Alkaline on an industrial concrete warehouse floor.
  • par Sam Marriott

Nettoyants pour béton acides ou alcalins : Lequel est le meilleur pour votre sol ?

Si vous entrez dans une quincaillerie et demandez un "nettoyant à béton", vous vous retrouverez probablement avec plusieurs options devant vous. La plupart des gens choisissent la bouteille avec l'étiquette d'avertissement la plus agressive, pensant que "plus c'est fort, mieux...

Plus

How to Sand a Painted Concrete Floor for Recoating
  • par Sam Marriott

Comment poncer un sol en béton peint avant de le repeindre

Dans notre guide Ponçage vs. Meulage : Préparation du béton précédemment peint, nous avons établi que si votre sol réussit le test d'adhérence par quadrillage, l'étape suivante pour un nouveau revêtement sera le ponçage. Choisir de poncer plutôt que de meuler vous fait économiser des centaines de livres...

Plus

FAQ

Veuillez consulter notre page FAQ pour en savoir plus.

Does the concrete need priming before the repair?
No. FlowFix Patch needs no primer. Make sure the substrate is structurally sound, clean and free from dust, oil, grease, paint and curing compounds, remove loose material by mechanical preparation, then pour the mixed mortar straight into the prepared area. Cut the repair edges square where possible for a secure bond.
Can it be used on damp concrete?
Yes. The substrate may be damp, but it must not contain standing water. Remove any free water from the repair before pouring. Do not apply when the substrate or air temperature is below the 5°C minimum, and protect the fresh repair from freezing until it is fully cured.
How deep can a single pour be?
Between 5mm and 100mm in one application. Thin feather edges are only acceptable in lightly trafficked areas; where medium or heavy traffic is expected, cut the edges of the repair square to depth rather than feathering out. The product is not suitable for repairs on sloping surfaces.
How long before the floor can be used again?
At approximately 20°C, allow 30 to 60 minutes before light foot traffic and around 2 hours before heavy traffic including forklifts. Setting time is 24 hours. Lower temperatures slow this down: at around 5°C, allow up to 24 hours before putting the area back into service.
Can the repair be painted afterwards?
Yes. Allow approximately 24 hours, then overcoat with a suitable floor coating. Left uncoated the repair cures to a concrete grey finish and resists oils and grease. It is also suitable for filling holes and voids before a floor is resurfaced.

Vous n'avez pas trouvé votre réponse ?

N'hésitez pas à nous contacter